Written before we start
The paperwork is the job.
NORMI's Level 4 material asks for assessment reports, a remediation protocol, a work plan, containment and PPE, moisture-source correction, post-remediation verification criteria and site-specific documentation. That list is our file for your project.
- The assessor's report and our scope review
- A remediation plan and a work plan for your building
- Containment and PPE recorded for the job
- The moisture source, what was corrected and what was referred on
- Verification criteria agreed up front, then the lab results against them
- A written before-and-after report and a prevention plan
